Grounds and Common Areas:

  • Rain City Rock & Waterscapes did a spectacular job with Paradise Estates' water features - they're not only complete but fully operational works of art. They're visually stunning and truly beyond our expectations.
  • By mid-July, the main vehicle entry gates will be installed and operational.
  • Community man gates to the public park and the vineyard are installed.
  • Landscaping is nearly complete, with work finishing up on beach front units four through eight – we expect final touches will be done by mid-July.
  • The roadway around Paradise Estates has recently been patched and cleaned; the second asphalt lift is scheduled for September 2018.mainarea

Central Entertainment Space and Boardwalk:

  • The beachside boardwalk is complete and connected.
  • The putting green and chipping area is complete and ready for use.
  • The pool and waterslide, built by Valley Pool & Spas, opens July long weekend. beachupdate

Paradise Estates Homes:

  • Interior work is still underway in approximately 12 of the homes. July2018constupdate

Interested in a tour? Contact us today to see Paradise Estates up close – we’ve only got a few homes left for sale.